Description
These systems are subjected to rigorous performance tests at factory as per UL, FM & NFPA standards to ensure proper performance of the system as per the design requirements. For completing the installation of these pre-engineered ‘ready to install’ packages the installing contractor only needs to grout the structural base, connect the suction & discharge pipes and incoming power.